New lawns
Sod installation
We install sod after the soil, the edges, and the water are checked. A new lawn in San Diego fails when those are skipped.

Inland yards in Eastlake, Otay Ranch, and Bonita are hotter than lawns in Point Loma or Coronado. The grass type follows the yard, not a single product.
The first two weeks of water establish the lawn. That watering is usually yours unless we write it into the quote. We water the sod in on installation day.
Sod is quoted as its own project. Once the lawn has rooted, it can go on a mowing route.
What the visit includes
A look first
Sun, grade, foot traffic, and irrigation. We do not order turf from a photo if the yard needs a walk-through.
Prep
Old lawn or weeds cleared. Low spots addressed. Edges set against beds and pavers.
Install
Sod laid tight and watered in the day it goes down.
After
A plain watering schedule. Mowing waits until the sod has rooted.
Before you book
Water
A new lawn uses water. If you want less lawn, say so. A cleanup or a planting bed may be the better job.
No survival guarantee
We do not publish a sod-farm partner or a promise that every piece will live. The work is prep, install, and a watering plan.
Questions
Do you install sod?
Yes. We check soil, grade, and irrigation, then lay the turf and water it in.
When can it be mowed?
Not the first week. We will tell you when it has rooted.
What about a slope?
Sometimes. Steep grades and missing irrigation can make sod a poor fit. We decide that on site.
Where this comes up often
Estimate for sod installation
Include the address, gates, and pets. A photo of the yard helps.
